25oC| Đà Nẵng, Việt Nam
  11:19:34 AM
Trang chủ » News & Events » Electrical industry news » Check the reservoir of A grid hydropower plant in Feb-2017

Check the reservoir of A grid hydropower plant in Feb-2017

On a monthly basis, the Central Hydropower Joint Stock Company (EVNCHP) in cooperation with the border guard station 629 – A Luoi district – Thua Thien Hue province to inspect the reservoir area of A Luoi hydropower.

On the side of EVNCHP, there are representatives of departments responsible for managing reservoir reservoir and reservoir 629, after more than 4 hours of canal check by canoe and inspection of submerged land sites carrying out planting work. Forest replacement for environmental protection. The results of this inspection are not unusual, reservoirs ensure normal water storage conditions, there is no case of illegal construction in the reservoir area.

“The inspection team is identifying the field position on the map”

“The lake near the dam”

“The lake at the confluence of Ta Dinh and A Sap River”

“Semi-submerged land is carrying out afforestation instead of environmental protection”